Implementation of an Integrated Surface Water Drainage Network
The project is part of the infrastructure works within the Clock Tower Project in Kalba and includes the implementation of a dedicated surface water drainage network according to the nature of the site and project requirements.
The scope of work includes the stages associated with preparing the network routes, excavation and pipe installation, as well as the execution of drainage elements, manholes, water catch basins, and related works.
The works are executed through an organized approach focused on precision in execution, quality of work, and commitment to project requirements throughout the different execution stages.
Scope of Work
An Integrated Surface Water Drainage System The scope includes the different execution stages required to establish the drainage network, prepare its elements, and complete the related site works.
1
Excavation & Route Preparation
Executing excavation and trenching works and preparing the required routes for the installation of the surface water drainage network.
2
Drainage Network Installation
Installing and laying drainage pipes along the designated routes and connecting the different sections of the network according to execution requirements.
3
Manholes & Water Catch Basins
Executing and preparing manholes, water catch basins, and elements associated with the drainage network.
4
Backfilling & Site Rehabilitation
Executing backfilling works and rehabilitating areas affected by excavation and execution works.
Execution Process
Project Execution Stages
From site preparation to completion of the network works.
01 — Site Preparation & Excavation
Preparing the work areas, executing excavation and trenching works, and preparing the routes for the drainage network.
02 — Network Installation & Execution
Executing pipe installation and laying works and connecting the network routes according to the plan and execution requirements.
03 — Network Elements Execution
Executing and preparing manholes, water catch basins, and drainage elements associated with the network system.
04 — Completion & Site Rehabilitation
Completing the works, rehabilitating areas affected by the execution, and preparing the site for the final stage.
Project Gallery
Project Execution Stages
Precision at every stage and quality in every detail of the surface water drainage network works.
Do You Have an Upcoming Project?
Let’s Talk About Your Project
Contact the AFAQ ALSHARQ team to discuss your project requirements and execution needs.