Surface Water Drainage Network

Surface Water Drainage Network

Clock Tower Project – Kalba, United Arab Emirates

Implementation of an Integrated Surface Water Drainage Network

The project is part of the infrastructure works within the Clock Tower Project in Kalba and includes the implementation of a dedicated surface water drainage network according to the nature of the site and project requirements.

The scope of work includes the stages associated with preparing the network routes, excavation and pipe installation, as well as the execution of drainage elements, manholes, water catch basins, and related works.

The works are executed through an organized approach focused on precision in execution, quality of work, and commitment to project requirements throughout the different execution stages.

Scope of Work

An Integrated Surface Water Drainage System
The scope includes the different execution stages required to establish the drainage network, prepare its elements, and complete the related site works.

1

Excavation & Route Preparation

Executing excavation and trenching works and preparing the required routes for the installation of the surface water drainage network.

2

Drainage Network Installation

Installing and laying drainage pipes along the designated routes and connecting the different sections of the network according to execution requirements.

3

Manholes & Water Catch Basins

Executing and preparing manholes, water catch basins, and elements associated with the drainage network.

4

Backfilling & Site Rehabilitation

Executing backfilling works and rehabilitating areas affected by excavation and execution works.

Execution Process

Project Execution Stages

From site preparation to completion of the network works.

01 — Site Preparation & Excavation

Preparing the work areas, executing excavation and trenching works, and preparing the routes for the drainage network.

02 — Network Installation & Execution

Executing pipe installation and laying works and connecting the network routes according to the plan and execution requirements.

03 — Network Elements Execution

Executing and preparing manholes, water catch basins, and drainage elements associated with the network system.

04 — Completion & Site Rehabilitation

Completing the works, rehabilitating areas affected by the execution, and preparing the site for the final stage.

Project Gallery

Project Execution Stages

Precision at every stage and quality in every detail of the surface water drainage network works.